Road Construction Works – Drainage Works at Central Business District Areas (CBD)
The public is advised that drainage works along the seaside section at Central Business District (CBD) areas will be carried out according to the following schedule:
- May 14 –16, 2026 – In front of Alvaro Building
- May 17–19, 2026 – In front of the Old Guadalcanal Headquarters
- May 20 –22, 2026 – Seaside eastern section of the Hot Bread Roundabout
The works will involve the construction of drainage pits and the installation of stormwater pipes.
In connection with these works, the public is further advised of the following:
- The outer (seaside) lane will be closed to traffic. Eastbound vehicles will be required to use the inner lane.
- The work area will be properly barricaded, with traffic signs and safety devices installed prior to the commencement of works.
- Pedestrian walkways and designated crossing points will be provided at selected locations. Safety Officers and Traffic Controllers will be on site to assist pedestrians and motorists and to ensure safe and smooth traffic flow.
- Due to lane narrowing, traffic congestion is expected. Members of the public are encouraged to plan their travel accordingly when entering the CBD area.
- Pedestrians and motorists are advised to follow the directions of Traffic Controllers, RTB personnel, and Police officers at all times while works are in progress.
- Pedestrians are required to use only designated crossing points to ensure safety and minimise traffic congestion.
- The Traffic Management Plans are attached for reference. Additional signage may be installed as required, and the work schedule may be adjusted depending on weather conditions.
Prefer to the attached Traffic Management Plan for details.
For enquiries, please contact:
- MID Safeguards-Roxsley Basil at 7582239 or email address RBasil@mid.gov.sb;
- Consultant’s Communications Officer, Lawrence Nodua on mobile number 7252525 or email lnodua@lmcp.com.sb
- CSC Safeguards, Jennifer S Kikolo on mobile number 7914014 or email jsikele@lmcp.com.sb
- Tioko Etupioh, CCECC Community Liaison Officer at mobile number 7680708
- Qi Rongbao, CCECC Authorized Management Representative email address qirongbaoccecc@gmail.com
- David Gange, CCECC Safeguard Specialist/ EHS Manager at 7376307 or dgange813ccecc@gmail.com
We appreciate your understanding and support as we continue to upgrade our city’s road infrastructure.
Thank you
This Public Notice is authorized by:
Mike Qaqara
Deputy Secretary Technical